BRIDGE OVER REMS (B29), MÖGGLINGEN
NEW CONSTRUCTION
client
Regional Council Stuttgart
description
In the course of the four-lane expansion of the B29 as part of the bypass at Mögglingen, a 132 m long, four-span bridge structure with separate superstructures for each direction of travel is required to cross the Rems. the
Spans are 30.0 m – 36.0 m – 36.0 m – 30.0 m. The prestressed concrete cross-section is designed as a two-web T-beam, the construction height is 2.0 m at the supports and decreases to 1.20 m in the field m. The total width of the structure between the railings is 27.60 m. During the planning, special attention was paid to the rems to be laid and the interests of nature conservation in addition to the S-shaped routing geometry.
Spans are 30.0 m – 36.0 m – 36.0 m – 30.0 m. The prestressed concrete cross-section is designed as a two-web T-beam, the construction height is 2.0 m at the supports and decreases to 1.20 m in the field m. The total width of the structure between the railings is 27.60 m. During the planning, special attention was paid to the rems to be laid and the interests of nature conservation in addition to the S-shaped routing geometry.
Period
2015
Services
Preparing the building design - RAB-ING
Participation in the preparation of the award
Participation in the preparation of the award